The City of Corpus Christi issued 378 residential swimming pool building permits in the nineteen monthly spreadsheets available to us, spanning January 2025 to October 2026. That is about twenty new pools a month inside the city limits alone. Portland, Port Aransas, Rockport, Ingleside, Aransas Pass, Robstown, Kingsville and unincorporated county land issue their own permits and are not included.
How we counted
Development Services posts "Fiscal Permit History Reports by Month" on the City website, in PDF and, for most months, Excel format. We used the Excel versions, which were available for January, April and May 2025 and every month from July 2025 through October 2026. February, March and June 2025 had no spreadsheet, so those months are missing rather than zero.
From each file we kept residential accessory building permits whose work type was a pool, and removed the separate electrical and plumbing sub-permits that accompany each pool so that every pool is counted once. Each row includes the permit date, ZIP code, pool area in square feet, a flood zone field, an optional declared value and the applicant's name. We do not publish addresses or company names; this page reports totals only.
Source: City of Corpus Christi Development Services, Fiscal Permit History Reports by Month (Excel versions), January 2025 to October 2026. Counts are our own and may differ slightly from official totals.
Permits by month
Bars show residential pool permits issued each month. Gaps are months with no spreadsheet.
| Month | 2025 | 2026 |
|---|---|---|
| Jan | 12 | 22 |
| Feb | n/a | 13 |
| Mar | n/a | 29 |
| Apr | 28 | 24 |
| May | 21 | 26 |
| Jun | n/a | 14 |
| Jul | 23 | 18 |
| Aug | 19 | 20 |
| Sep | 21 | 22 |
| Oct | 17 | 19 |
| Nov | 19 | n/a |
| Dec | 11 | n/a |
Permit volume in Corpus Christi is steadier through the year than in many inland cities. The busiest month in the data was March 2026 with 29 permits, and April 2025 had 28. Only December 2025 dropped close to ten. That fits a climate where pools can be built in any month and where the swimming season starts in April.
The drought shows up only lightly. Through most of the period the City was in Stage 3 restrictions, which allowed filling a pool only to protect its structure, yet permits kept coming at about twenty a month. Many owners were likely planning for the day restrictions eased, as they did in 2026.
What it means for you. Spring is busy, but not overwhelmingly so. Filing in late fall or winter beats the spring rush that peaks in March and April, and lets the pool be ready when the water warms up.
Where the pools are: ZIP codes
ZIP code as entered on each permit record.
One ZIP code dominates. 78418, which covers Flour Bluff and North Padre Island, had 134 permits, 35 percent of the total. The Southside's 78414 had 96, and 78415 on the west side had 62. Together these three account for 77 percent of all residential pool permits in the city. Calallen's 78410 had 20, and the bay-side and midtown ZIPs each had 15 to 18.
The pattern follows newer housing and the water. Flour Bluff and the island combine newer homes, canal lots and a beach lifestyle. The Southside has the city's largest concentration of 1990s to 2020s subdivisions. Older central neighborhoods had fewer new pools but, as remodel jobs often do not need a building permit, they are probably underrepresented here.
How big: pool water area
Water area as entered on each permit, grouped into size bands.
Every permit lists a pool area. The median was 360 square feet, with the middle half of permits between about 264 and 453 square feet. For comparison, a 15-by-24-foot rectangle is 360 square feet and a 16-by-32 is 512.
- 53 permits (14%) were under 200 square feet, plunge-pool territory.
- 124 permits (33%) were under 300 square feet.
- Only 17 (4%) were 700 square feet or larger.
Corpus Christi builds smaller pools than many Texas suburbs, where 450 to 600 square feet is common. Plunge pools are a big reason; see plunge pools.
Flood zones
The permit records include a flood zone field using older map letter codes. It was filled in on 252 of the 378 permits:
| Recorded flood zone | Permits |
|---|---|
| A (special flood hazard area) | 115 |
| B (moderate hazard, older code) | 32 |
| C (minimal hazard, older code) | 105 |
| Blank | 126 |
In 78418, 99 of 134 permits (74 percent) showed zone A. In other words, most new pools on the island and in the low-lying stretches of Flour Bluff are being built in a special flood hazard area, which brings floodplain review and design considerations. Read our flood zone and windstorm guide.
Note that these codes come from older flood insurance rate maps and are only what was entered on the permit. Check your own address on the current FEMA map.
Declared values
Just 86 permits out of 378 carried any declared value. Among those, the median was about $45,000, the middle half ranged from about $10,000 to $68,000 and the top tenth was above $82,000. Because most permits list no value and some list only a nominal figure, we do not use these numbers as a price guide. Our cost guide relies on current cost surveys and builder pricing instead.
Who builds the pools
Fifty-four different applicant names appear on the 378 permits.
- The busiest applicant had 70 permits. It focuses on small pools; its median pool area was about 200 square feet.
- The top five applicants together had 178 permits, 47 percent of the total.
- Twenty-nine names had only one or two permits.
- At least one of the busier names is a permit expediting service that files on behalf of builders, not a builder itself.
So Corpus Christi has a handful of high-volume builders and a long list of small ones. Both can do excellent work. The applicant name on a permit is also useful for homeowners: if a builder tells you they have done many pools in your area, the City's reports will show it.

What the numbers suggest
- Small pools are mainstream here. A plunge or compact pool is not a compromise in Corpus Christi; it is one of the most common choices.
- The island leads, and most island pools are in a flood zone. Plan for floodplain review and groundwater from the start.
- Builders are busy year-round, with a modest spring peak. Winter is a good time to design and file.
- Check names against the record. Permit reports are public and list applicants.